W.S. Gibbs Memorial Park Maintenance Hub

Lifetime Fitness

Ground-up new construction of 2 story, E+ Box prototype with associated pool deck and all relevant site work and utilities. Building includes hot tubs, cold ...
VIEW SERVICES

Hilltop Energy Center

Hilltop Energy Center involves the construction of a 610 MW natural gas-fired combined cycle power plant featuring a single-shaft GE 7HA.02 unit, which includes one ...
VIEW SERVICES
Hamilton County Readiness Center2

Hamilton County Readiness Center

This project involved the construction of a new two-story military training facility designed to accommodate training operations for over 294 soldiers. The scope included comprehensive ...
VIEW SERVICES

Klondike Elementary School

The Klondike Elementary School project involved a carefully coordinated addition and renovation of classroom spaces, all completed within occupied school facilities to maintain uninterrupted learning. ...
VIEW SERVICES
City of Anderson Transit Station1

City of Anderson Transit Station

This project in downtown Anderson involved the development of a state-of-the-art, multi-modal transit hub designed to enhance community connectivity and urban mobility. The one-story north ...
VIEW SERVICES
IMG_5467

Oliver Winery

Our team successfully managed three major projects as part of a comprehensive construction and renovation initiative. This included a full remodel and renovation of existing ...
VIEW SERVICES

W.S. Gibbs Memorial Park Maintenance Hub

Avon, IN

This design-build project involved the construction of a durable and functional post-frame building measuring 60’ x 120’ x 16’, designed to support a variety of uses with low-maintenance features and high-performance materials. The structure includes a covered porch, full overhangs on all sides, and interior ceiling liner panels with exterior wainscot panels, all designed for longevity and aesthetic appeal. Seamless gutters were installed to ensure proper drainage and protect the building envelope. The project also included extensive concrete work, including the building slab, covered porch slab, paved areas, and sidewalk installation. Plumbing scope covered a fully equipped bathroom with a toilet, sink, and utility sink, along with a floor drain, 150 feet of interior sanitary lines, 100 feet of water lines, and one frost-proof hydrant to ensure year-round functionality. This post-frame facility combines practical design with efficient systems, reflecting a streamlined and cost-effective construction approach.

Project Value

$415,000

Client

Hendricks County Parks & Recreation

Architect

Genesis Design, Inc

PROJECT GALLERY

READY TO CONNECT?

Partnering with PH means developing a relationship built on trust. We would love to talk to you today about your next project.

Scroll to Top