Prospect Lake Clean Water Center

Lifetime Fitness

Ground-up new construction of 2 story, E+ Box prototype with associated pool deck and all relevant site work and utilities. Building includes hot tubs, cold ...
VIEW SERVICES

Hilltop Energy Center

Hilltop Energy Center involves the construction of a 610 MW natural gas-fired combined cycle power plant featuring a single-shaft GE 7HA.02 unit, which includes one ...
VIEW SERVICES
Hamilton County Readiness Center2

Hamilton County Readiness Center

This project involved the construction of a new two-story military training facility designed to accommodate training operations for over 294 soldiers. The scope included comprehensive ...
VIEW SERVICES

Klondike Elementary School

The Klondike Elementary School project involved a carefully coordinated addition and renovation of classroom spaces, all completed within occupied school facilities to maintain uninterrupted learning. ...
VIEW SERVICES
City of Anderson Transit Station1

City of Anderson Transit Station

This project in downtown Anderson involved the development of a state-of-the-art, multi-modal transit hub designed to enhance community connectivity and urban mobility. The one-story north ...
VIEW SERVICES
IMG_5467

Oliver Winery

Our team successfully managed three major projects as part of a comprehensive construction and renovation initiative. This included a full remodel and renovation of existing ...
VIEW SERVICES

Prospect Lake Clean Water Center

Fort Lauderdale, FL

This project involves the design and construction of a new water treatment plant, known as the Prospect Lake Clean Water Center (PLCWC), located in Fort Lauderdale, Florida. The facility is being delivered through an Engineer-Procure-Construct-Commission (EPCC) model and will be capable of producing finished water at a maximum instantaneous rate of approximately 50 million gallons per day (MGD).

As part of the project, two ADA-accessible pre-engineered metal buildings will be supplied and installed: a 9,968 SF Administration, Control, and Warehouse Building, and a 15,189 SF Nano Filtration Building.

The scope also includes the installation of concrete and precast components, as well as complete plumbing, HVAC, and electrical systems.

The Administration, Control, and Warehouse Building will include concrete foundations and a floor slab, a pre-engineered metal building structure, and exterior insulated precast concrete panels. The building will feature insulated walls, hollow metal doors, and insulated coiling overhead doors. Interior construction will consist of new stud and gypsum board partition walls, suspended acoustic ceilings, raised access flooring, and full mechanical, plumbing, and electrical installations, along with all associated finishes.

The Nano Filtration Building will include concrete foundations and a floor slab, a pre-engineered metal building structure, and exterior insulated precast concrete wall panels. It will also include hollow metal doors and insulated coiling overhead doors. Interior work will consist of new stud and gypsum board walls, mechanical, plumbing, and electrical systems, and all required interior finishes.

Project Value

$10,000,000

Sq. Footage

25,157

Client

City of Fort Lauderdale

Architect

Kiewit Engineering & Design Co.